CBT Systems
CBT Systems CBT Systems CBT Systems CBT Systems CBT Systems CBT Systems CBT Systems CBT Systems

Project:


Location:



On-Air:
30,000 Sq. Ft. Digital
Sports Production Facility

DiamondView Tower
10th & J Streets -The Ball Park District
San Diego, California 92101

June 9, 2007

Consultation of the COX Media Production facility in San Diego, California began in 2006 with sightline studies using manlifts and a remote controlled helicopter to ensure that the view into Petco Park would be perfect from the Studio. Work continued with Architectural Consultation and Building Infrastructure Specification Development.

Full Scale Mock-Ups for each Operational Control Space in the facility were set up at CBT so that the operational positions could be examined and figured out long before the building was finished.

In January 2007, CBT Systems provided the Detailed System Design, Integration Management, Station Relocation and complete Technical System Integration. Using Grass Valley’s Ignite HD integrated production system with its CameraMan HD robotic camera system; on June 9, 2007 COX produced it’s first live HD Post Game Sports Show.


CBT Systems Provided
  • Architecture Design Consultation
  • Electrical and Mechanical Design Consultation
  • Building Construction Coordination
  • Systems Design Development
  • Full Scale Mockups
  • Detailed Systems Design
  • Equipment Procurement
  • Equipment/Material control
  • Systems Integration
  • Systems Testing/Training