CBT Systems
   
   
 
CBT Systems Provided:
  • Architecture Design Consultation
  • Mechanical Design Consultation
  • Electrical Design Consultation
  • Systems Design Development
  • Detailed Systems Design
  • Equipment Procurement
  • Equipment/Material Control
  • Systems Integration
  • Systems Testing
  • Systems Operational Training
 

Dole Network

Project: 40,000 Sq Ft
Digital/Media Broadcast Facility

Location: Westlake Village, CA

On-Air: January 2007

 

The Dole Network utilizes one of the most advanced digital HD file sharing, storage and live editing systems in the world. Implementing Apple Xservers, RAID Media Storage and MacPro Final Cut Studio platforms, the end-to-end unitized Work Flow is further enhanced with fully integrated Low Rez Browsing, Media Logging, and Archiving with Partial Restore.

Work began in January of 2004 with Architectural Consultation and Building Infrastructure Specification Development. It continued into 2005 with Detailed System Design and Equipment Procurement.

In April 2006 system integration began. Utilizing TBC IntelliTrac consoles all of the work areas and monitor walls can be easily reconfigured for future expansion or changes in personnel.

The full facility, along with Network Master Control and Satellite Earthstation was ready for Production and Broadcasting in early 2007.