CBT Systems
   
   
 
CBT Systems Provided:
  • Architecture Design Consultation
  • Mechanical Design Consultation
  • Electrical Design Consultation
  • Full Scale Mockups
  • Detailed Systems Design
  • Equipment Procurement
  • Equipment/Material Control
  • Systems Testing
  • Systems Operational Training
 

ABC7

Project: 160,000 Sq Ft
Media Broadcast Facility

Location: Glendale, CA

On-Air: December 9, 2000

 

CBT Systems work on this substantial project began in 1998 with Architectural Consultation and Building Infrastructure Specification Development. It continued on through 1999 with Technical Systems Design Development, highlighted by the construction of Full Scale Mock-Ups for each Operational Control Space in the facility.

In January 2000, CBT Systems and ABC7 agreed to continue their relationship with CBT Systems providing the Detailed System Design, Integration Management, Station Relocation and complete Technical System Integration. These efforts culminated on December 9, 2000 as ABC7 began full time "On-Air" operations from the new facility.

Full size mock-ups were utilized to provide ABC7's production personnel the ability to preview and evaluate the console designs and placement in the new Post and Production Control Rooms. From experience, CBT Systems has learned that full size mock-ups help identify sight lines, equipment placement, and space planning design issues efficiently before being built and installed.

CBT Systems assisted ABC7's Management, Engineering and Operations staff, and Project Architect, in developing a facility design that would serve the station with its transition to multi-channel digital broadcasting.